Cyclone Season Readiness: How Hire Businesses in Australia and New Zealand Can Prepare Their Fleet
Cyclone season officially started on 1 November. If you run a hire business anywhere between Broome and Cairns, you already know what that means. The phones get busier, everyone watches the forecasts more closely, and every generator in the yard suddenly has a customer’s name next to it.
The season runs until 30 April. On average, the first cyclone doesn’t cross the Australian coast until late December, so there are still a few weeks to get organised. This guide covers what to sort out now, so you’re not scrambling when the first warning comes through.
It isn’t only a problem for the far north, either. Last season the Bureau of Meteorology counted 11 tropical cyclones in the Australian region, one more than the long-term average, and Tropical Cyclone Narelle crossed the coast in three different states. Across the Tasman, businesses in Hawke’s Bay and Tairāwhiti still remember what Cyclone Gabrielle did in 2023. If you hire out equipment anywhere in Australia or New Zealand, a cyclone can end up being your problem.
Why cyclone season puts hire businesses under pressure
When a cyclone is on its way, everyone wants the same gear at the same time: generators, water pumps, lighting towers, traffic management equipment and temporary power. Councils, emergency services, builders and event organisers usually need it within hours, not days.
Meanwhile, you’ve got your own staff, depots and fleet to look after. Demand peaks right when it’s hardest and riskiest to get equipment out the door. If you can’t quickly see where everything is and what’s actually available, that pressure gets a lot worse.
What your rental software needs to handle during cyclone season
Stock visibility across every depot
Say a cyclone is tracking towards Townsville and your depot there has already hired out every 20kVA generator. If you can see that Mackay has four sitting in the yard, they can be on a truck that afternoon. If that information is in a spreadsheet at another branch, you might not find out until the job has gone to someone else.
Being able to see live stock levels across all your depots is the most useful thing your system can give you during the season. In MCS Rental Software, every branch can see what’s available at every other branch in real time, so moving gear to where it’s needed is a quick decision, not a round of phone calls.
A mobile app that works when the signal drops
Your drivers and techs will be working in exactly the places where mobile coverage drops out first. If their app stops working every time the signal does, you lose track of who has what at the moment it matters most.
That’s why we built offline sync into the MCS Rental Software mobile app. Your team can keep recording updates in the field with no coverage, and everything syncs automatically once the signal comes back, so nothing has to be re-entered or remembered later.
Fast quotes and contracts for emergency hire
When a council rings at 4pm needing pumps by the morning, a quote that takes an hour to put together means you’ve lost the job. In an emergency, the job usually goes to whoever comes back first with a firm price.
MCS lets your team build a quote and turn it into a contract in minutes, so you can confirm the job while the customer is still on the phone.
A way to keep trading if a depot goes down
If your system runs on a server in the back office and that office loses power or gets cut off by floodwater, nobody can trade. MCS Rental Software is cloud-hosted, so your data is stored off-site. If one depot goes down, another branch, or someone working from home, can log in and keep taking bookings and sending out gear.
Your pre-season cyclone checklist
The businesses that handle cyclone season well treat it as something they plan for every year, not something they react to each time a warning goes out. Here’s what to work through before December:
- Check last season’s hire history. Which equipment categories spiked, and at which depots? Adjust stock levels and depot allocation now, not mid-event.
- Finish servicing and safety checks. Generators, pumps and lighting towers should be serviced, tested and tagged well before the first warning, not the week it’s issued.
- Test your mobile app somewhere with poor coverage. Turn off mobile data and run a delivery from start to finish. It’s better to find the gaps now than in the middle of a storm.
- Agree how stock moves between depots. Decide who approves a transfer, who books the transport and how it’s recorded, so nobody is stuck waiting on an email chain when a region is under threat.
- Get your emergency customers ready. Make sure accounts, contacts and credit limits are up to date for the councils, contractors and emergency services you’re likely to hear from.
- Know where the warnings come from. Follow the Bureau of Meteorology’s tropical cyclone forecasts in Australia and MetService in New Zealand, and make sure your depot managers do too.
The upside of being prepared
Cyclone season is a risk to manage, but it’s also some of the most valuable short-notice work of the year. The hire businesses that come out of it best usually aren’t the biggest. They’re the ones that knew what they had and where it was, and could get a contract signed quickly while their competitors were still ringing around the branches.
Frequently asked questions
Ready to elevate your rental business?
Connect with our expert team to discover how MCS Rental Software can drive your success. We’re here to answer your questions and help you find the perfect solution.